Audiobook Studio

Professional AI Production Pipeline for Long-Form Narration

Local-first with optional Voxtral

Hear the Machine Walk You Through

This isn't just a static demo. Every word of the audio preview was synthesized using Audiobook Studio. Listen to a live showcase of our narration engine explaining its own architecture.

Studio Walkthrough: "The Craft of Local Narration"
Studio Voice Comparison: XTTS vs Voxtral
Studio Voice on XTTS Local

The same script rendered through the private local-default engine.

Studio Voice on Voxtral Cloud

The same script rendered through the optional Voxtral engine.

Same voice. Same script. Different engine. This makes it easier to hear what changes when a profile stays the same but the synthesis path changes. Audiobook Studio is built around a local-first private workflow: XTTS stays fully local, while Voxtral is the optional cloud path.

Audiobook Studio Central Dashboard showing the Hero Section and book mockup
The Studio Tour

Complete Control Over Every Word

01. Multi-Project Library

Manage multiple audiobook productions from a single unified hub. Track Word counts, processing ETAs, and asset locations for an unlimited number of concurrent projects.

  • Centralized project management
  • At-a-glance production status
  • Deep metadata tracking
Project Library showing book cards and production status

02. The Narrator Studio

Build a cast of unique narrators with local XTTS profiles by default, or unlock optional Voxtral voices in Settings when you want a hosted cloud path.

  • XTTS local voice cloning
  • Optional Voxtral cloud voices
  • Managed engine-per-voice profiles
Narrator Studio showing custom voice profiles and cloning interface

03. Granular Production

Go beyond "all-or-nothing" synthesis. Our production workspace allows you to assign different voices to specific characters or paragraphs, and regenerate audio at the segment level.

  • Multi-voice character scripting
  • Paragraph-level regeneration
  • Text normalization preview
Production Workspace showing granular character assignment and segment control

04. Auto-Tuning Pipeline

Never guess when your audio will be ready. Our processing engine learns from your hardware's actual performance to provide dead-accurate progress bars and ETAs.

  • Hardware-aware ETA logic
  • Batch processing with live logs
  • Integrated system console
Smart Queue showing processing progress and hardware-aware ETAs

05. Privacy & Local-First

Stay in control of your intellectual property. XTTS keeps your manuscripts, voice assets, and finished audio on your own hardware by default. Voxtral remains an explicit opt-in cloud option for the voices you choose to route through it.

  • Local XTTS workflow by default
  • Optional cloud per voice profile
  • Clear privacy tradeoffs in Settings
Professional microphone in a moody studio setting
Optional Demo Content

Explore a Finished Workflow on Day One

When you install via Pinokio, you can opt into our predefined demo library so you can start clicking buttons, queueing audio, and listening to characters without building any assets first.

The Demo Project

Immediately after installation, you will see a pre-built project waiting in your Library to dive into.

Demo Project Dashboard
Demo Chapters Interface

Pre-Configured Chapters

Open the project to find chapters ready for preview. You can listen, queue generation, or instantly stitch and build the final audiobook M4B right from this view without pasting text.

Included Voice Cast

The demo comes fully loaded with pre-configured narrator and character voices. They are ready to be used in the demo, or immediately drafted into any of your own new projects.

Demo Voices
Honest Comparison

Why a Local Audiobook Workflow Matters

ElevenLabs is polished and easy to start with. Audiobook Studio is strongest in different places: privacy, ownership, and the freedom to keep fixing a book without watching credits disappear.

Audiobook Studio vs. ElevenLabs

This is not a "we beat them at everything" comparison. It is a practical look at what matters when you are producing a full audiobook.

Category Audiobook Studio ElevenLabs Studio
Cost over time Free after setup, local hardware cost only Subscription and credit based
Privacy Local-first, files stay on your machine Cloud workflow
Ownership Local project files and local voice assets Platform account workflow
Voice assignment Character and segment based editing inside your project Section, paragraph, and character assignment in Studio
Repair workflow Local segment repair and partial chapter requeue Paragraph or word regeneration in the cloud
Setup More involved Easier to start
Baseline polish Good with careful samples and tuning Usually stronger out of the box
Full-Length Book Example
$99-$330+

A 600,000-character book can push hosted voice generation into Pro or Scale territory once normal revisions begin.

What the credits turn into

Using public ElevenLabs pricing as of March 24, 2026, here is what a realistic 600,000-character production cycle can look like.

Scenario Likely spend
Single voice, clean Flash/Turbo pass $99
Single voice with moderate corrections $99
Heavy custom voice iteration $330 or multiple months
Higher-cost models, clean pass $330 or multiple months
Higher-cost models with revisions $330+
  • Every pronunciation fix can consume more credits.
  • Every alternate take makes the final book more expensive.
  • With Audiobook Studio, those corrections stop affecting your bill after setup.
Clean first pass
The manuscript generates cleanly with minimal repair work.
$99 hosted
Local after setup
Normal revisions
Pronunciations, pacing, and small fixes start to pile up.
$99 hosted
Still local
Heavy iteration
Alternate takes and repeated correction passes raise the hosted cost quickly.
$330+ hosted
Still local
Custom voice workflow
Testing cloned voices and retries is where subscription pressure really starts to show.
$330+ hosted
Still local
See the detailed cost breakdown Effective usage rates, credits, and plan tiers

These tables use the same 600,000-character example and the current public ElevenLabs pricing assumptions listed below.

Production type and effective cost

Production type Credit rule Cost / 1k chars Clean pass 1.5x revisions
Standard single voice 0.5 credits / char $0.08 $50 $75
Custom cloned voice 0.5 credits / char $0.11 $66 $99
Higher-cost models 1 credit / char $0.22 $132 $198

Scenario, credits, and plan needed

Scenario Credits needed Likely plan Monthly spend
Single voice, clean Flash/Turbo pass 300k Pro $99
Single voice with moderate corrections 450k Pro $99
Heavy custom voice iteration 600k Scale or multiple months $330 or multiple months
Higher-cost models, clean pass 600k Scale or multiple months $330 or multiple months
Higher-cost models with revisions 900k Scale $330+

Sources: ElevenLabs Pricing, What are credits?, ElevenLabs Studio

Ready to Try Audiobook Studio?

Choose the path that fits you best:

Easiest setup

Install with Pinokio
Best for most people. Pinokio handles the local setup and can optionally install a demo library with sample voices so you can explore the app immediately.

Pinokio Install Page
Flow: Listen to demo → Install with Pinokio → Open local app → Try sample library

Manual / developer setup

View the GitHub Project
Best if you want direct control over the project files, scripts, and development workflow.

Documentation and help

Read the Wiki
Step-by-step setup, feature walkthroughs, and troubleshooting help.

Not sure yet?

You’re already in the right place. Use this demo to hear the voices, review the workflow, and decide which installation path feels right before committing.